1110 Lloyd Lane South

Estimate for 1110 Lloyd Lane S 1110 Lloyd Lane South, Verona, ON K0H 2W0

# Category

Qty

Unit

Cost

Total

Foundation Enhancements Install new steel jack posts

1

Labour & Material

$7,600.00 $7,600.00

3.1

supported by 24x24x7 1/4" concrete footings reinforced with (3) 15M bars evenly spaced. Fasten steel base plate to concrete using 2" long Tapcon screws (typical). Prepare a new 24"x24"x7" concrete footing reinforced with three 15M bars evenly spaced in both directions. Place a 6" layer of compacted granular 'A' beneath the footing. Ensure that all elements (steel plate, jack post, and concrete footing) are aligned and properly secured.

4 Year Round Water Supply

1

ƶ 2,200.00

ƶ 2,200.00

Heated Water Line Heated water line to ensure easy, year round use by residents.

1

Labour & Material

$2,200.00 $2,200.00

4.1

5 Household Drinking Water

1

ƶ 2,200.00

ƶ 2,200.00

Water Equipment Supply & Install new pressure tank & UV Light Example of UV Light

1

Labour & Material

$2,200.00 $2,200.00

5.1

6 3rd Bedroom

1

ƶ 0.00

ƶ 0.00

Optional Third Bedroom Creation of Third Bedroom with Double French Doors with frosted Glass. Closet optional. $2980

1

Labour & Material

$0.00

$0.00

6.1

7 Insulation

1

ƶ 3,100.00

ƶ 3,100.00

Spray Foam Insulation Supply & Install R20 Spray Foam in crawl space floor joists. Boreal Nature

7.1

1

Labour & Material

$3,100.00 $3,100.00