Estimate for 1110 Lloyd Lane S 1110 Lloyd Lane South, Verona, ON K0H 2W0
# Category
Qty
Unit
Cost
Total
Foundation Enhancements Install new steel jack posts
1
Labour & Material
$7,600.00 $7,600.00
3.1
supported by 24x24x7 1/4" concrete footings reinforced with (3) 15M bars evenly spaced. Fasten steel base plate to concrete using 2" long Tapcon screws (typical). Prepare a new 24"x24"x7" concrete footing reinforced with three 15M bars evenly spaced in both directions. Place a 6" layer of compacted granular 'A' beneath the footing. Ensure that all elements (steel plate, jack post, and concrete footing) are aligned and properly secured.
4 Year Round Water Supply
1
ƶ 2,200.00
ƶ 2,200.00
Heated Water Line Heated water line to ensure easy, year round use by residents.
1
Labour & Material
$2,200.00 $2,200.00
4.1
5 Household Drinking Water
1
ƶ 2,200.00
ƶ 2,200.00
Water Equipment Supply & Install new pressure tank & UV Light Example of UV Light
1
Labour & Material
$2,200.00 $2,200.00
5.1
6 3rd Bedroom
1
ƶ 0.00
ƶ 0.00
Optional Third Bedroom Creation of Third Bedroom with Double French Doors with frosted Glass. Closet optional. $2980
1
Labour & Material
$0.00
$0.00
6.1
7 Insulation
1
ƶ 3,100.00
ƶ 3,100.00
Spray Foam Insulation Supply & Install R20 Spray Foam in crawl space floor joists. Boreal Nature
7.1
1
Labour & Material
$3,100.00 $3,100.00